Corridor Cost Schedule
Borders & Corridors → Corridor Schedule maintains each corridor's standing cost model: the toll, border-fee, and permit lines that fold into every trip on that corridor. This schedule is the baseline the per-trip estimates and all planned-vs-actual variance reads are built from.
Picking the corridor
Choose the corridor in the Corridor picker (corridors are created on Border Master Data).
Adding a cost line
In Add cost line:
| Field | Notes |
|---|---|
| Kind | Toll, Border fee, Permit fee, Escort, Clearing fee, or Other |
| Basis | Per trip (flat charge) or Per km (scales with distance) |
| Description | e.g. N4 Maputo corridor toll |
| Amount | In major units (e.g. 450.00) |
| Currency | The ISO code the charge is levied in |
Editing and removing
Each line has Edit (inline — change kind, basis, description, amount, currency) and Delete. Unlike the border-post and corridor records themselves, schedule lines are fully editable — they are prices, and prices move.
Keeping it honest
- Update the schedule the moment a toll or border fee changes — every quote and every variance figure downstream depends on it.
- The check on whether your schedules match reality is Corridor Costs: persistent positive variance means this page is out of date.