Corridor Cost Schedule

Borders & Corridors → Corridor Schedule maintains each corridor's standing cost model: the toll, border-fee, and permit lines that fold into every trip on that corridor. This schedule is the baseline the per-trip estimates and all planned-vs-actual variance reads are built from.

Picking the corridor

Choose the corridor in the Corridor picker (corridors are created on Border Master Data).

Adding a cost line

In Add cost line:

FieldNotes
KindToll, Border fee, Permit fee, Escort, Clearing fee, or Other
BasisPer trip (flat charge) or Per km (scales with distance)
Descriptione.g. N4 Maputo corridor toll
AmountIn major units (e.g. 450.00)
CurrencyThe ISO code the charge is levied in

Editing and removing

Each line has Edit (inline — change kind, basis, description, amount, currency) and Delete. Unlike the border-post and corridor records themselves, schedule lines are fully editable — they are prices, and prices move.

Keeping it honest

  • Update the schedule the moment a toll or border fee changes — every quote and every variance figure downstream depends on it.
  • The check on whether your schedules match reality is Corridor Costs: persistent positive variance means this page is out of date.